Saturday, January 7, 2012

DIY Deck Part 3: Joists 70% done

After the hard work getting the bearers in, the joists (so far) have gone in pretty quick.



Put down some weedmat first, and a bit of sand/rock to hold it in place. Also set in some crossbracing (probably redundant with all the joists being fixed in, but whatever) and the joists are held in with triplegrips at 400mm centres. 


Got the first 10 or so joists fixed in, and will get the rest done probably tomorrow - need to trim them to fit in around the brick pier first.



And then more internal framing to do so the picture border can go in.

Pretty annoyed with how one dodgy ebay seller is holding up progress though.

*EDIT* Turnes out the delay was due to the courier company managing to lose a parcel in the 10km between the seller and myself. Even so, if a seller isn't going to be working for a certain period, they shouldn't be advertising items for sale if they're not going to post them for a week. *



T&T

Thursday, January 5, 2012

DIY Deck Part 2: Bearers all in

So I finished installing all the bearers yesterday - mixing concrete is hard work!


So these are the 4 bearers that will support the deck. 3 are long, with 5 stirrups supporting each, and one is shorter with 4 stirrups.
 

8 of the supports are concreted in place. The black strip is an idea picked up from some DIY forums - basically it's dampcourse material, same used to stop damp moving up your walls. When it rains, it'll stop the water pooling on top of the bearers and joists, hopefully prolonging the lifespan of the deck. There's a proprietary product called Protect-A-Deck which costs a fortune, or by using dampcourse, it's $13 to do the whole deck and then some leftover.

This is one of the things I like about DIY - you can take as much time as you want to research how things are done - and you realise just how likely it is for a contractor to skip things because you (the customer) don't know any better. Would a contractor use this kind of protective strip? Probably not. Will your contractor use sealer/preservative over the cut ends of treated pine bearers/joists? Maybe, if you're lucky. Will your contractor calculate the exact spacing of your joists so they're even, or will they simply slap joists down at 450mm centres and have an uneven one leftover? Will they even use the correct nails, joist hangers, unities/triplegrips? Unfortunately if you don't know what questions to ask and what specifications to check on, you'll probably get something less than the bare minimum. I certainly don't pretend to know everything about decking, but it does take time to read up on best practices, if you can find the time.

I'ev been getting ready for the next stage of the project by making sure all some of the hand-me-down tools I've scrounged are clean, sharp and ready to go - new blades for the circular saw, removing rust from the set square, various OCD things like that!

Tomorrow - I'll be putting on some crossbracing across the bearers, placing weedmat and rock, and installing the joists.

T&T

Sunday, January 1, 2012

Happy New Year! DIY Deck Part 1!

Happy New Year! My New Year's resolution was decided weeks ago - to finally get the deck built in the outdoor room. Did some rough sketches in Visio first to get an idea of the rough dimensions, plus a few more detailed drawings.



This is what our backyard currently looks like - the brick pier is joined to the main house slab by some massive concrete channels, which is useful for attaching some of the bearers. Theres a forest of weeds elsewhere in the backyard!


Anyway, before xmas I cleared up the outdoor room area, removed the temporary step made up of bricks & sand, pulled out all the weeds and used weedkiller before spreading out the sand to level things up. Dug 8 postholes for footing - there will be 11 brackets on existing concrete. No point actually using posts since there's only about 300mm from the ground to the finished floor level.

And today (New Years Day) it decided to be about 35 degrees - a little warm to be doing decking, but I was pretty keen to get cracking on it all, since I had some timber delivered last week for the substructure. Treated pine bearers and joists, with Merbau decking to be ordered and delivered once the framework is done. Here are 4 brackets bolted in for the outermost bearer.


These are pretty nifty things - drill a 10mm diameter hole in the concrete with a good hammer drill, blow out all the concrete dust, install one 10mm diameter self-tapping concrete bolt in the big washer and loosely tighten. This way, you can still rotate the bracket and fine tune positioning, rather than hoping to get it 100% aligned during the bracket installation! Of course make sure all the metalwork is galvanised (or stainless steel).

 First bearer installed. 10mm galvanised coachbolts retaining the bearer. Once everything is nice and level, tighen the bolts holding the brackets in. I've got it setup so after using 2/90x45 bearers, 90x45 joists and approx 20mm decking, it'll be 10mm below the rear door sill - sweet! (I hope!)

 And the next bearer installed exactly the same way. However this one has a little cantilever off the end so the deck will "project" out over the ground.

 And of course, rechecking to make sure everything is still nice and level.


There's two more bearers to install closer to the house, however they will have one bracket on concrete, and 4 stirrups cemented into postholes. Probably won't get these done until Wednesday, as it's going to be 40 tomorrow and about 38 the day after, and after sweating it out today I'm not going to do that again!

This is definitely the biggest DIY job around the house, but so far, so good. I was quoted $7000 for this deck to be done by a tradesperson, and so far I'm estimating the materials to cost about $2000. Fair bit of labour involved, but I have another 3 weeks off work which should see it completed by then!

T&T

Saturday, December 24, 2011

DIY: Constructing a side gate Part Two

With the gate frame hung, time to finish things off - really wanted it done by xmas day, so I finished 99% of the gate yesterday. Usual disclaimer applies - these pictures for informative/educational purposes only, no responsibility taken if you cut a finger off or your house collapses while trying anything you see here etc.

Picked up some screening slats from our local timber wholesaler, a hardwood called Ironsomething in 180cm width, 7cm height. You can also use decking timber as slats, but most decking timber is reeded (grooved underneath) whereas slats are DAR (Dressed All Round, or smooth/finished on all sides) and slats are thinner/weigh less than decking. Anyway I had planned to use 17 slats, but after trial fitting all the slats, took a few off to reduce weight on the gate. Fortunately the precut length was exactly right for the gate size.

 

You need to predrill all the holes for mounting the slats, otherwise the wood will crack. Drill out the holes large enough so the fixing screws don't impact on the wood!


Calculate the proper spacing for your slats and mark on the frame. That said, I tried to calculate the right distances and I must've screwed something up, because after marking the frame and trial fitting the slats again, everything was way off. I gave up on that, and used a couple of hardwood stakes to get the spacing right. Anyway, I fitted the first three top and bottom slats, then every few slats after that I rechecked all the spacings.


Seemed to turn out OK. Now, if I'd been more prepared here, I would've bough a bit of extra galvanised steel to reinforce the centre mount of each slat, as 180cm is quite a wide span. I'll get it done in a week or so. To secure the slats to the metal frame, I used galvanised self-tapping metal screws. Make sure they're galvanised or stainless steel screws (more expensive) to prevent rusting!



Finally, with a bit of muscle from Tina, we rehung the game. Let's see the dog get out of this one!


 So there's only a couple of things left to get this gate finished properly.
  1. Reinforce the middle of the gate with a gate of extra galvanised steel, and secure each slat to that to prevent the slats sagging over time.
  2. After a week or two of weathering, stain/oil the timber. Will choose a dark stain to match the bricks.
  3. Install a latch to the brickwork to secure the gate shut.
Pretty happy so far with how it has turned out. Overall cost, about $160 for the gate frame kit, $10 in misc screws, $95 for timber. 10 minutes to screw the frame together, 15 minutes to align and install hinges, and about an hour to measure out, predrill and screw in the slats and hang.

And to everyone, merry xmas - hope there's plenty of beer and food coming your way!

T&T

Tuesday, December 20, 2011

DIY: Constructing a side gate Part One

Since we moved in, been struggling to find time to do all the little jobs, but we're slowly crossing them off the list. I'd tried to get some people in to quote on making a side gate, but no-one is interested in small jobs - or if they are, they quote exorbitant amounts to make it not worth your while. Anyway, we need a proper side gate to keep the dog secure.

Thing you might need: Safety gear( gloves, eye and ear protection. A level. Drill/driver. Timber screws. Measuring tape. Hammer or mallet. 

So we picked up a Fortress gate kit from our local hardware supplier. This is just a frame kit, you can choose from a variety of heights and widths, and if it doesn't suit your width exactly, you can cut the width using a hacksaw. For us, the 1.8m wide kit was just right.


The horizontal bars are on the left, and the vertical bars are on the right. Hinges are pre-installed. I laid out the kit so I could figure out where each section would go. Since it's a wide gate, there's a diagonal brace. Very important the the brace runs diagonally down to the bottom hinge as shown in the photo below! If it's the other way around, it doesn't brace the gate in compression and your gate will come apart!



Anyway, it was pretty simple to put it together, took me about 10 minutes. Use a mallet or hammer with a bit of scrap wood to put everything together. The kit comes with some self-tapping metal screws to secure all the parts once you've put it together.


End result. This gate is 1.8m wide and 1.4m high.


So this is where the gate is going to be placed. I thought about attaching the gate with the hinges against our wall, but I'm not that keen on using Dynabolts, chemset screws etc into our brickwork to hold the weight of the gate. Instead, I've decided to mount the gate with the hinges on one of the existing fenceposts, the one painted a bit grey on the right. The fencepost isn't quite plumb vertical, but I can allow for that. Should the fence be replaced in future, just need to unscrew the hinges and re-mount the gate.

  

Ideally you'd have a second person to help you install these hinges. Estimate where the gate should go and make sure it clears any ground covering you have. Try to get the hinges plumb vertical. The kit doesn't come with any screws to install the hinges, so I got a packet of these timber screws as shown.


After both hinges are secured, hang your gate frame!

And if you took some care, the gate should be nice and level after all your work.

 So with the frame all installed and level, the next step is to choose what cladding to put on it. You could use traditional timber pickets, colorbond, slats etc. We'll head out later this week to pick what cladding to use; most likely a Merbau to be stained dark; though I'm also considering a composite product that doesn't require ongoing maintenance.

Cost of the frame kit was about $150, plus a few bucks for the hinge screws. Just need to add in the cost of cladding and more self-tapping metal screws to attach it to the frame, and then a latch to secure it against the house. So far, a pretty simple project, not too costly, and well worth giving it a shot if you can't get any reliable tradesmen to give you a quote on making your own side gate!

T&T