Thursday, October 29, 2009

Power Pit finally being installed!

Went by the house after work, and look what's appeared on the footpath!

These guys were just finishing up the job, but will be back tomorrow as they couldn't finish it all today. Cool digging equipment allows them to trench right under the road to the power pole opposite!

One thing I need to check is that the power pit isn't connected to the live wires - apparently the builder is meant to organise this connection through the local retailer (Tru Energy). I'm wondering if I should contact Tru Energy to arrange connection, rather than relying on Metricon to do it?

T&T

Wednesday, October 28, 2009

Fencing is up, a few days early!

So we decided to drive by our block after work to check whether the powerpit had been done - guess we shouldn't be too surprised that the powerpit still hasn't been done, another deadline by Jemena missed.

However, driving up to the house, we were surprised to see this:
Was meant to be done on Friday, but in a later email we found the fencer had some time this morning to stick up the fence. How exciting - though this is only for the demolition, it signals to the neighbours that something is about to happen! We've only told one neighbour to the left, and the opposite neighbour, but now I guess the whole street knows!

T&T

Building Permit Approved - 4 days in council, is that a record??

So things are really starting to happen now!

We received our "final" construction drawings last week, but had to correct a few things:
- ensuite had shower rail and rainfall head together, instead of at opposite ends of the double shower
- powder room door swung wrong way
- Light switch placed behind door
- some electrical items at wrong height
- added note that benchtop runs all the way to window splashback

and after 7 goes at getting it right, we finally signed off on the correct drawings yesterday!

We also received word that our building permit was approved - it only took 4 days! It helps we already did the legwork to get the building over easement approvals months ago, and that alone took 3 weeks for a rubber stamp! Our CSC says they use a private company to submit the approvals, and providing the siting and design is done in line with Rescode (which our house complies with) there is usually less than a week to approve the build.

We also received our plans in the mail yesterday with the energy assessment, and apparently we've got a 5.5 star energy rated house, which is nice to know! Didn't really design the house with energy rating in mind (even added a couple of windows on the west side, which is meant to be a no-no).

We're still waiting on our tile appointment results, about $2000 worth of feature tile upgrades. We were lucky enough to be able to use the original Metricon/Beaumont tile selection range instead of the reduced range brought in around August. We upgraded to a nice mosaic tile around the powder room mirror, the same mosaic in the ensuite shower niche, and also an aluminium stripe around the fully tiled ensuite. Will have to upload photos, but Tina has the tiles at her parent's place.

On other things related to the redevelopment:
- power pit being installed today - they say! We paid for this September 23 and was meant to be done within a month, but some delays here for whatever reason.
- Temporary fence for the demolition is being installed Friday. The annoying thing is that virtually all fencing companies will quote for a 6 month minimum, and they all want about $350 - all we need the fence for is 2 weeks or so!
- Demolition booked for week after Cup day - I hope they can start earlier, as we've got the fence up early, but it's all up to their schedule. Need to have a completion date before we can get a re-establishment survey completed.

And hopefully we'll be in the clear with a week to spare before penalty delay payments kick in!

Maybe the next time we post, it'll be with demolition pictures!

Friday, October 23, 2009

Construction drawings received, building permit applied for!

So yesterday afternoon (Thursday) we received an email from our CSC with our final construction drawings, and a standard email saying that we're to check they're correct, sign and return. With the additional line "Please note no changes or alterations at this stage are permitted"!

Anyway, we had a look through the plans and found a few errors, including:
  • Laundry and powder room tiling not shown
  • Wrong exhaust fan to powder room
  • Data and cable internet access at wrong height
  • FC infill noted where brick infill is
  • Powder room door swings open the wrong direction
and the big one, a muckup in the ensuite shower layout. We swapped around the WC and toilet in the ensuite, so we could get a bigger shower (1600x900) and added a rainfall showerhead in. Anyway, the ensuite elevations were all screwy with the showerhead and rainfall located in all weird positions.

So we sent an email to our csc last night noting these errors. We got an email at 9:30am today saying she was on the case, and revised plans sent through 30 minutes later. Way to go Mendo!

Unfortunately there was one issue now caused, by correcting the powder room door swing direction, the light switch ended up behind the door. So sent another email through, and true to form another revised plan sent an hour later.

Now maybe we're just extremely lucky, or Metricon are desperate for us to sign & approve the construction drawings, but today we've had nothing but excellent service from Mendo and the Metricon drafting team - keep it up guys & gals!

Anyway, by the time I had time to check my email it was after business hours - things look good on the plans now, so we'll sign this weekend and email it back to M.

On other news, "My Metricon" has had a few updates;
  • Finance approval has been received
  • Sewerage/water permit has been approved
  • Contract engineering is completed
  • And Building permit has been applied for today! And Building permit approval is expected to be Oct 28!
Honestly, a few nights ago I had a dream (no joke) our slab was done, and I was walking the dog around it... can't wait for that to come true!

still waiting for our tile selections and costing to be finalised and emailed to us, though we're not sweating on this one, as it's not critical to the initial build stage. I also called our demolition crew to see if they could start early, seeing as the old house is deserted now, but they're flat out with other work and will hopefully start 2nd week of November as planned.

Anyway, the main message here is rule #1 for all home builders - READ, CHECK, RE READ, RE CHECK all your documents and plans before signing anything! And once you've done that, read and check again! Unfortunately I have this niggling little worry that no matter how thorough we think we've been so far, there's probably been a few glaringy obvious errors that we won't become aware of, until they become a problem we have to fix. But that's the fun and risk of building!

T&T

Monday, October 19, 2009

Old house being stripped - nearly done!

So, last Friday I had the evaporative cooling unit, pipes, remote control and vents all yanked out of the old house and stored in my parent's garage over the weekend. Was all installed today, so thankfully should have some relief for the upcoming summer heat!

Finished moving things out of the house yesterday too, thanks to my uncle and his delivery van! The only thing left in the house now is dust, asbestos, and a few squashed spiders!

Also made a few phone calls today to check on how everything is progressing for the pending demolition of the house.
  1. Electricity has been fully disconnected - meter is gone and overhead power line cut off.
  2. Gas: Called to check the service pipe has been disconnected - yep, not a problem!
  3. Underground power pit: was paid for at the end of September, and the operator advised me the installation date is tomorrow, so I'm hoping to go by the house in the afternoon and see $1600 worth of electrical manhole in the pavement!
  4. Beaumont Tiles - some thorough readers may remember a while ago when we first saw the M tile selection, it was HUGE, and then a month or two after, it was NOTHING (literally, from a selection of over 100 tiles, to less than 15!). I raised this point with our CSC<>
Finally, in the afternoon today Mendo sent us the revised copy of the preconstruction variations, which we'll sign off on tomorrow and email back to her.

I'm hoping that once the powerpit is installed, I'll organise some security fencing and give my demolition guy a call, and hopefully might even start on the demolition earlier than planned!

Stay tuned, for tomorrow afternoon hopefully we can post tile selection pics!

T&T